Skip to main content
Skip to main content

906020

MP200 Emergency Power Equipment Replacement

Phase:Design
Estimated Total Cost:$22,000,000
Estimated Completion:Oct 2027
Architect:Harley Ellis Devereaux (HED) Architects

This project will replace the obsolete emergency power system at 200 Medical Plaza (MP200), also known as the Peter Morton Medical Building. The existing emergency power system is original to the building and has reached the end of its service life, making it vulnerable to failure.